The perimeter of a rectangle is given by the formula P = 2l + 2w
Work out the value of P when l = 7.5 and w = 4.2
2 marks
Show answer
23.4
4
E = 3a − 2b
Work out the value of E when a = −4 and b = 5.
2 marks
Show answer
-22
5
Work out the value of x2 + 7x when x = 6.
2 marks
Show answer
78
6
5y = 35
Work out the value of y.
Work out the value of 2y2
3 marks
Show answer
a) 7b) 98
7
Simplify 4c × 2d
Work out the value of 4c × 2d when c = 3 and d = 1.5
3 marks
Show answer
a) 8cdb) 36
8
Here is a table of values for 4n − 5
n
2
5
?
?
4n − 5
?
?
19
35
Work out the four missing numbers in the table (the two n values and the two values of 4n − 5 marked ?).
4 marks
Show answer
3, 15, 6, 10
9
F = 5v + 20
Work out the value of F when v = 6.
Work out the value of v when F = 95.
4 marks
Show answer
a) 50b) 15
10
A tool hire company uses this rule to work out the cost of hiring a floor sander.
Total cost = £45 × number of days + £60 deposit
Meera hires the sander for 7 days. Work out her total cost.
Liam's total cost is £555. Work out the number of days Liam hires the sander for.
4 marks
Show answer
a) £375b) 11
11
Work out the value of 2a − 3b when a = −1 and b = 4.
Work out the value of 4a2 + b when a = −3 and b = −7.
4 marks
Show answer
a) -14b) 29
12
The speed, S, in metres per second of a runner is given by the formula
S = 60t
where t is the time in seconds taken to run 60 metres.
Work out the value of S when t = 4 and when t = 12.
Zara says, “When t gets bigger, S gets bigger.” Use your answers to part (a) to show that Zara is wrong.
Work out the value of t when S = 7.5
4 marks
Show answer
a) 15 and 5b) t = 4 gives S = 15 but t = 12 gives S = 5, which is smallerc) 8
13
v = u + at
Work out the value of v when u = 7, a = 9.8 and t = 5.
Work out the value of t when v = 87, u = 12 and a = 5.
4 marks
Show answer
a) 56b) 15
14
y = 3(x + 4)
Work out the value of y when x = 5
Work out the value of x when y = 27
4 marks
Show answer
a) 27b) 5
15
m = 3n − 2p
Work out the value of m when n = −5 and p = 4.
Work out the value of n when m = 19 and p = −2.
4 marks
Show answer
a) -23b) 5
16
Work out the value of 5x + 2y when x = 4 and y = −3.
Work out the value of x2 − 4x when x = −2.
D = (h + 3k) ÷ 2 Work out the value of h when D = 10 and k = 4.
6 marks
Show answer
a) 14b) 12c) 8
17
A builder uses the formula C = 8n + 45 to work out the cost, in pounds, of a job that takes n hours.
Priya estimates the cost of a 16 hour job as £150.
An estimate is acceptable if it is within 10% of the cost given by the formula.
Is Priya's estimate acceptable? You must show your working.
4 marks
Show answer
No
Every question here is original and written by Robinson Tuition. The grade follows the Edexcel grade descriptors and suits AQA and OCR too; this is not an exam-board paper.